Endre Bjørndal (), Mette Bjørndal (), Kjetil Midthun () and Golbon Zakeri ()
Additional contact information
Endre Bjørndal: Dept. of Business and Management Science, Norwegian School of Economics, Postal: NHH , Department of Business and Management Science, Helleveien 30, N-5045 Bergen, Norway
Mette Bjørndal: Dept. of Business and Management Science, Norwegian School of Economics, Postal: NHH , Department of Business and Management Science, Helleveien 30, N-5045 Bergen, Norway
Kjetil Midthun: SINTEF Technology and Society, Postal: SINTEF Technology and Society, P.O. Box 4760 Sluppen, NO-7465 Trondheim, Norway
Golbon Zakeri: Dept. of Engineering Science, University of Auckland, Postal: The University of Auckland, Private Bag 92019, Auckland 1142, New Zealand
Abstract: We consider an electricity market organized with two settlements: one for a pre-delivery (day-ahead) market and one for real time, where uncertainty regarding production from non-dispatchable energy sources as well as variable load is resolved in the latter stage. We formulate two models to study the efficiency of this market design. In the myopic model, the day-ahead market is cleared independently of the real-time market, while in the integrated stochastic dispatch model the possible outcomes of the real-time market clearing are considered when the day-ahead market is cleared. We focus on how changes in the design of the electricity market influence the efficiency of the dispatch, measured by expected total cost or social welfare. In particular, we examine how relaxing network flow constraints and, for the stochastic dispatch model, even the balancing constraints in the day-ahead part of the dispatch models affects the overall efficiency of the system. This allows the dispatch to be infeasible day-ahead, while these infeasibilities will be handled in the real-time market. For the stochastic dispatch model we find that relaxing the network flows and balancing constraints in the dayahead part of the market provides additional flexibility that can be valuable to the system. In our examples with high up-regulation cost we find a value of "overbooking" that lead to lower total costs. In the myopic model the results are more ambiguous, however, leaving too many constraints to be resolved in the real-time market only, can lead to infeasibilities or high regulation cost.
Keywords: OR in Energy; Stochastic Programming; Electricity Markets; Market Design
32 pages, August 25, 2016
Full text files
2401598
Questions (including download problems) about the papers in this series should be directed to Stein Fossen ()
Report other problems with accessing this service to Sune Karlsson ().
RePEc:hhs:nhhfms:2016_012This page generated on 2024-09-13 22:16:22.